Bid Information

See below for City of Lockport projects currently advertising as well as previously opened 2020 project bid results. For bidding information from previous years please contact City of Lockport to submit a formal FOIA request.

2020 Current Advertisements

2020 Resurfacing Program
Project description:       This project will involve the resurfacing of various City of Lockport Streets to provide a safe comfortable ride for users as well as repair curb and gutter to address street flooding.
Letting date/time:
 
March 12, 2020 - 11:00 am
Letting location:    City of Lockport - Central Square, 3rd Floor
    

2020 Sewer Lining Program
Project description:       This project will involve cured in place pipe lining of lines sewer main that is identified in previous years televising to be in poor condition.
Letting date/time:
 
March 19, 2020 - 10:00 am
Letting location:
 
 
 
City of Lockport - Central Square, 3rd Floor   

2020 Bid Results

2nd Street - 5th Street Water Main Replacement and Roadway Reconstruction Project
Project description:       Project will involve the full reconstruction of various streets located between 2nd Street to 5th Street from State Street to Madison Street. The project will include full removal and replacement of water main, roadway pavement and base, curb and gutter, storm sewer and landscape restoration.
Letting date/time:
 
December 19, 2019
Letting location:
 
 
 
City of Lockport - Central Square, 3rd Floor
Bid tabulation: 
 
 
 
 
2nd - 5th Bid Tabulation

Awarded to:
 
 
 
 
 
 
 
 
Austin Tyler Construction

14th Street - 18th Street Water Main Replacement and Roadway Reconstruction Project
Project description:       Project will involve the full reconstruction of various streets located between 14th Street to 18th Street from State Street to Lawrence Avenue. The project will include full removal and replacement of water main, roadway pavement and base, curb and gutter, storm sewer and landscape restoration.
Letting date/time:
 
December 19, 2019
Letting location:
 
   City of Lockport - Central Square, 3rd Floor

Bid tabulation: 
 
 
 
 
 
14th - 18th Bid Tabulation

Awarded to:
 
 
 
 
 
 
 
 
 
Austin Tyler Construction

2020 Projects Planned For Bid

2020 Storm Water Program
This project will involve the evaluation and design of improvements to address storm water issues as determined by Staff.

2020 Pavement Marking Program
This project will involve pavement marking rehabilitation on various streets located throughout Lockport as determined by staff. 

2020 Crack Filling Program
This project will involve crack filling on various streets located throughout Lockport as determined by staff. 

5th Street - 9th Street Water Main Replacement and Roadway Reconstruction Project
The project will include full removal and replacement of water main, roadway pavement and base, curb and gutter, storm sewer and landscape restoration.

2020 Sidewalk Program
Project to include removal and replacement of sidewalk throughout Lockport that has been deemed unsafe.