Snow Removal

Snow Removal Plan

The City has established a priority plowing system to help traffic move as efficiently and as safe as possible. Priority One streets are those that are main streets, including those in subdivisions, roads that link arterials, and those streets with schools located on them. Priority Two streets are minor residential, side streets, and those cul-de-sacs with steep inclines and/or sharp curves. Priority Three streets include dead ends, cul-de-sacs and alleys. There are a number of roads within the city that are plowed and salted by the Illinois Department of Transportation, i.e., Route 171 (State Street/Archer Avenue), Route 53 (Broadway), and Route 7 (159th Street/9th Street), including the high level bridge. Will County plows Division Street east of Briggs and Briggs Street south of Division. Also, as a reminder, City Ordinance 70.27 states, "no person shall park any vehicle upon public streets at any time after snow begins to fall and for a period of eight hours after snow stops falling on the streets and public parking lots. If the snow on the street exceeds two inches in depth, the parking prohibition shall continue until snow removal operations are complete."

See Snow & Ice Control Policy

See Snow Removal Route Map

Jodi Herman, Administrative Assistant
eMail: city@lockport.org

Snow Removal

snowflake