The City of Lockport is now accepting requests for the 2015 Sidewalk Program.  The City will remove and replace damaged sections of sidewalk provided that one of the following criteria are met:

  • Sidewalk is cracked into three or more pieces with the cracks being at least 1/8” wide or wider.
  • More than 50% of the sidewalk surface is chipped or spalled.
  • Sidewalk has raised or settled to the point where the raised/settled section is more than 1” above or below adjacent sections.

Requests will be taken until May 15th, 2015. You may submit directly through the Submit a Request link above, or by calling the Public Works department 815-838-0549, option 8.